REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Remove:
the battery (see Battery: Remova
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the battery (see Battery: Removal
REMOVAL
I - REMOVAL PREPARATION OPERATION
Put the vehicle on a two-post lift (see Vehicle: Towing and lifting).
Disconnect the battery (see Battery: Removal - Refitting).
Remove:
the non-ret
D4F or K9K, and JH3
REMOVAL
I - REMOVAL PREPARATION OPERATION
Disconnect the battery (see ) (MR 392, 80A, Battery).
Remove:
the scuttle panel grille (see Scuttle panel grille:
Removal - Refitting) (MR 393, 56A, Exterior
equipment),
the scoop under the scuttle panel grille (see Scoop
un
IMPORTANT
Consult the safety and cleanliness advice and operation
recommendations before carrying out any
repair (see Airbag and pretensioners: Precautions
for the repair) (88C, Airbags and pretensioners).
IMPORTANT
To avoid any risk of triggering when working on or
near a pyrotechnic component (ai