Renault Clio: Solenoid valve assembly pressure sensor: Removal - Refitting
K9K, and JA5

REMOVAL
REMOVAL PREPARATION OPERATION
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
- To discharge the accumulator, run command
" Discharge pressure accumulator " AC081.
To confirm the pressure drop, read the " Hydraulic
pressure " parameter for the resulting value.
If there is still pressure in the accumulator, re-run the
" Discharge pressure accumulator " command until
the pressure is negligible and will not pose a risk
when the high pressure pipes are removed.
The pressure reading must be close to zero.
- Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
- Remove:
- the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery),
- the battery tray (see Battery tray: Removal - Refitting)
(MR 392, 80A, Battery),
- the air filter unit (see Air filter unit: Removal - Refitting)
(MR 392, 12A, Fuel mixture).

- Disconnect the solenoid valve unit pressure sensor connector (1).
- Remove the pressure sensor from the solenoid
valve unit (1) using a long socket.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Fit the solenoid valve unit pressure sensor.
- Finger tighten the solenoid valve unit pressure sensor.
- Torque tighten the solenoid valve unit pressure
sensor (15 Nm)
- Connect the solenoid valve unit pressure sensor
connector.
II - FINAL OPERATION.
- Refit:
- the air filter unit (see Air filter unit: Removal - Refitting)
(MR 392, 12A, Fuel mixture),
- the battery tray (see Battery tray: Removal - Refitting)
(MR 392, 80A, Battery),
- the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
- Carry out the necessary programming (see Fault
finding - Replacement of components (MR 394,
21B, Sequential gearbox).
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil is at the MIN mark.
D4F, and JA3

REMOVAL
REMOVAL PREPARATION OPERATION
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
- To discharge the accumulator, run command
" Discharge pressure accumulator " AC081.
To confirm the pressure drop, read the " Hydraulic
pressure " parameter for the resulting value.
If there is still pressure in the accumulator, re-run the
" Discharge pressure accumulator " command until
the pressure is negligible and will not pose a risk
when the high pressure pipes are removed.
The pressure reading must be close to zero.
- Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
- Remove:
- the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery),
- the battery tray (see Battery tray: Removal - Refitting)
(MR 392, 80A, Battery).

- Disconnect the solenoid valve unit pressure sensor connector (1).
- Remove the pressure sensor from the solenoid
valve unit (1) using a long socket.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Fit the solenoid valve unit pressure sensor.
- Finger tighten the solenoid valve unit pressure sensor.
- Torque tighten the solenoid valve unit pressure
sensor (15 Nm)
- Connect the solenoid valve unit pressure sensor
connector.
II - FINAL OPERATION.
- Refit:
- the battery tray (see Battery tray: Removal - Refitting)
(MR 392, 80A, Battery),
- the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
- Carry out the necessary programming (see Fault
finding - Replacement of components (MR 394,
21B, Sequential gearbox).
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil is at the MIN mark.
READ NEXT:
D4F, and JA3
REMOVAL
I - REMOVAL PREPARATION OPERATION
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
To discharge the accumulator, ru
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
To discharge the accumulator, ru
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the battery (see Batte
SEE MORE:
K9K
WARNING
Always check the oil level using the dipstick.
Do not exceed the maximum level on the dipstick
(could destroy the engine).
Correct the engine oil level if necessary before
delivering the vehicle to the customer.
Note:
When topping up the engine oil, always leave at
least 10 minutes be
DP0 or JH3 or JR5 or TL4
Deflector
Propeller shaft
Driveshaft yoke sleeve
Spider
RC gaiter
Tightening clip
Lock ring
Tightening ring
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Di
© 2016-2025 Copyright Renault Clio Owners Club
