EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
left-hand side window demister
vent.
left-hand side air vent.
windscreen demisting vents.
centre air vents.
right-hand side air vent.
right-hand side window demister
outlet.
passenger footwell heater outlets.
control panel.
Centre air vents.
Air flow
Move the contro
K9K, and 750 or 752
REMOVAL
Position the vehicle on a two-post lift.
Remove the scuttle panel grille (see Scuttle panel grille: Removal -
Refitting).
Disconnect the exhaust gas recirculation solenoid valve electrical
wiring harness (4).
Detach the electric wiring harness.
Disconnect