EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
K9K, and 764 or 766 or 768
To remove/refit the exhaust gas recirculation mountings (see 14A,
Antipollution, Exhaust gas cooler: Removal - Refitting, 14A-7).
K9K, and 750 or 752
REMOVAL
I - REMOVAL PREPARATION OPERATION
Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Batt
With the ignition on, move stalk 1
A park.
B intermittent wiping.
The wipers will pause for several
seconds between sweeps. It is
possible to change the time between
sweeps by turning ring 2.
C normal wiping speed.
D fast wiping speed.
Positions B, C and D are acces