EQUIPMENT LEVEL E3 LEISURE or EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2
or EQUIPMENT
LEVEL EA3 or EQUIPMENT LEVEL EA4 or EQUIPMENT LEVEL EA5 or EQUIPMENT LEVEL EAG
The removal - refitting procedure
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be in
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the wheel in question (see 35A, Wheels and ty
I - PREREQUISITES FOR WHEEL BALANCING
Wheel balancing is a measurement operation.
Several conditions must be met to achieve a reliable
result in a single operation.
The wheel balancer must be installed in accordance
with the manufacturer's instructions.
It is essential to calibrate the bala
K9K
REMOVAL
I - REMOVAL PREPARATION OPERATION
Disconnect the battery (see Battery: Removal - Refitting).
Loosen the clip (1) between the air duct and the air
flowmeter.
Disconnect the air flowmeter connector.
Unfasten the air duct and remove it.
Disconnect the air flowmeter connector.
II