K9K
K9K, and 764 or 766 or 768 or 772
First fitting of the exhaust gas cooler recirculation
assembly
(1) Exhaust gas recirculation solenoid
valve
(2) Exhaust gas cooler
(3) Exhaust gas inlet pipe
(4)
K9K, and 764 or 766 or 768
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect the bat
K9K, and 764 or 766 or 768 or 772
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 392, 02A, Lifting equipment).
Disconnect
K9K, and 750 or 752 or 764 or 766 or 768
Note:
Vehicles equipped with the K9K*768 engine may or
may not be equipped with an intercooler.
Disconnect the battery (see Battery: Removal - Refitting)
(MR 392, 80A, Battery).
Disconnect the inlet pressure sensor (1).
Remove the air duct (3) betwee
EQUIPMENT LEVEL EA1 or EQUIPMENT LEVEL EA2 or EQUIPMENT LEVEL EA3 or
EQUIPMENT LEVEL EA4
or EQUIPMENT LEVEL EA5, and DOCUMENTATION PHASE 1
STRIPPING
I - STRIPPING PREPARATION OPERATION
Remove the front bumper (see 55A, Exterior protection,
Front bumper: Removal - Refitting, 55A-1).
II - STRIPPI