D4F or K9K, and JA3 or JA5
I - SEQUENTIAL GEARBOX
WARNING
If any operation is carried out on the electro-hydraulic
unit, it is essential to clean the unit using a cleaning
product and compressed air.
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
To discharge the accumulator, ru
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
Note:
When replacing the electric pump assembly,
always replace the control relay.
IMPORTANT
Before any operation on the sequential system,
disc
The level should be read with the engine
switched off and on level ground.
This should be checked frequently,
and immediately if you notice even the
slightest loss in braking efficiency.
The engine may be hot
when carrying out operations
in close proximity. In
addition, th