D4F or K9K, and JA3 or JA5
I - SEQUENTIAL GEARBOX
WARNING
If any operation is carried out on the electro-hydraulic
unit, it is essential to clean the unit using a cleaning
product and compressed air.
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
IMPORTANT
Before any operation on the sequential system,
discharge the accumulator using the Diagnostic
tool.
To discharge the accumulator, ru
K9K, and JA5
REMOVAL
I - REMOVAL PREPARATION OPERATION
Note:
When replacing the electric pump assembly,
always replace the control relay.
IMPORTANT
Before any operation on the sequential system,
disc
REMOVAL
I - REMOVAL PREPARATION OPERATION
Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
Remove:
the engine undertray,
the radiator mounting cross member bolt on the
right-hand side,
the sub-frame tie-rod bolt on the left-hand side.
Remove the wheel trim using hubcap
tool 1 (located in the tool kit) by engaging
the hook in the opening near
valve 2.
To refit it, align it with valve 2. Push the
retaining hooks in fully, starting with
side A near the valve, followed by B
and C, finishing at D opposite the valve.